  • Carbon Capture and Usage System

  • This is my major individual design project. The work presented here make up the initial research stage which helped to fully define the problem and inform the later design stage. I selected this project due to my personal interest in environmental design and desire to tackle an important societal issue.
  • Project - Individual Duration: Ongoing
  • Analysis of the Concrete Industry with regards to End of Life Concrete Carbonation

  • See Full Report
  • ep
  • Sankey diagram showing mass flow through the concrete lifestyle
  • Review of Existing Technologies for the Carbonation of End of Life Cement Fines

  • See Full Report
  • Project Progress Report, Detailed Design Specificatidson & Considerations for Future Work

  • See Full Report
  • Pumped Thermal Energy Storage

  • See Full Report
  • A group design and business project, with a brief to reduce energy problems in developing countries. We developed an energy storage system that provides 24h power to rural communities without the deteriorating capacity of existing batteries. I focused on the design of the reversible compressor/turbine system.
  • Group Project - Team of 6 Duration: 14 weeks
  • Design & Business Summary Poster

  • See Full PDF
  • ep
  • A summation of the entire group project (Designed by Me)
  • ep
  • Render and exploded view of compression sub-system
  • ep
  • Diagram of scroll compressor chamber profile
  • Engineering Drawings

  • See All Drawings
  • ep
  • Large scroll compressor engineering drawing
  • Business

  • This section includes two group business plans, one of which is the 'Pumped Thermal Energy Storage System'. Individual work includes a business case study and assessment pieces on leadership, costing and sustainability.
  • Business Plan: Pumped Heat Thermal Energy Storage System

  • See Full PDF
  • See Business Plan
  • ep
    ep
  • Business plan summary poster
  • Business Plan: Serpentine Experience

  • See Business Plan
  • ep
  • Concept drawing for 'The Serpentine Experience'
  • Business Model Case Study: Riversimple

  • See Full Report
  • Leadership Report: Richard Branson

  • See Full Report
  • Costing Report: Tesla RoboTaxi Fleet

  • See Full Report
  • Sustainability Report: Monster Beverage Corp.

  • See Full Report
  • Design Optimisation

  • See Full Report
  • This project focused on the development of a model to optimise a wind turbine blade for maximum power generation. The approach taken used a sparse grids system to effectively and efficiently assess the entire sample space.
  • Project - Individual Duration: 5 weeks
  • ep
    ep
  • Optimised wind turbine blade and representation of the sparse grids methodology.
  • User Centered Design

  • See Full Report
  • This project aim was to develop a bespoke product for a specific user with Chronic Fatigue Syndrome. The product developed was a mobile, adaptable supporting device. During this project, my work focused on the design thinking process, physical prototyping, CAD modelling and rendering.
  • Group Project - Team of 3 Duration: 5 weeks
  • Empathetic Design Tools

  • ep
  • Empathy and Pain area mapping to develop empathy and understanding with the user
  • ep
  • Journey Mapping to locate issue areas in daily activities
  • CAD Rendering

  • ep
  • Render Showing the Lätt Lägga (Rest easy)
  • Prototyping and development

  • ep
  • Development of clamp, cushion and ratchet mechanism
  • Industrial Mechanism Design

  • See Full Report
  • This task was to design a fully autonomous friction welding machine for syringe filters, made from two casings and a filter paper. The machine involved a sorting mechanism and rotary chucks to perform each stage of the process. For this project, I focused on the early design stage & concept generation. Later on, I produced the full CAD model, render and failure analyses.
  • Group Project - Team of 2 Duration: 7 weeks
  • CAD Render

  • ep
  • Full Industrial Mechanism CAD Render
  • Engineering Drawings

  • ep
  • Rotary disk assembly consisting of five chucks which allow for simultaneous operation completion, actuated via servo motor
  • ep
  • Component organising and sorting assembly
  • Failure Analysis

  • ep
  • Top level failure analysis, breaking design down to sub systems
  • ep
  • Individual sub system failure analysis
  • Mechatronics

  • See Full Report
  • This project goal was to design a mechatronic system to locate magnets and mark them with plastic cups within an XY gantry. The solution involved a linear scanning system with three hall effect sensors and a helical screw cup dropping mechanism. My role in this project was the design and complete construction of the mechanical system and software implementation.
  • Group Project - Team of 2 Duration: 5 weeks
  • Demonstration of system in operation
  • Software

  • ep
  • Software operational flow diagram
  • Hardware

  • ep
    ep
  • Mechanical system overview (left) and sub-system alignment (right)
  • CAD Render

  • ep
  • ep
  • ep
  • Early design stage CAD modelling
  • Snowmobile Shaft Design

  • See Full Report
  • This design task was to design a snowmobile shaft and drive system. The solution involved a belt driven shaft with tensioner. My primary tasks included component selection to fit specification requirements and CAD modelling.
  • Group Project - Team of 2 Duration: 6 weeks
  • ep
  • Full engineering drawing of shaft, belt and pulleys
  • ep
  • Engineering drawing of snowmobile track shaft
  • Motorbike Restoration

  • This 1979 KZ400 had been off the road for 20 years when I bought it. The restoration included a full engine overhaul, frame modification and various other additions and alternations to the original. All work was completed without any outsourcing.
  • Project - Individual Duration: 8 months
  • Before

  • After

  • ep
    ep
  • Restoration

  • Redesign

  • ep
    ep
  • Reverse Engineering

  • See Full PDF
  • In this project a complete reverse engineering review was completed on a Vacmaster Vacuum Cleaner. This involved a complete product teardown and analysis of various design features.
  • Project - Individual Duration: 8 weeks
  • ep
    ep
  • Assembly and Materials Analysis
  • ep
    ep
  • Component Role and Function Analysis
  • ep
    ep
  • Manufacturing and Cost Analysis
  • ep
    ep
  • User Experience Analysis
  • Carpentry Projects

  • ep
    ep
  • ep
    ep
  • Rustic Wine Box Table with Wine Rack Ends, Duration – 3 Days
  • ep
    ep
  • A-Level Design and Technology Project: Folding Coffee Table/ Sun Lounger, Duration – 3 months
  • Costing

  • See Full PDF
  • In this project a complete reverse engineering review was completed on a Vacmaster Vacuum Cleaner. This involved a complete product teardown and analysis of various design features.
  • Project - Individual Duration: 8 weeks
  • ep
  • Monte Carlo costing method